MOKYS
Ministry of Defence SR
More detailsMinistry of Defence SR
MOKYS
Short description: | Mobile Communication System (Stage 5) |
---|---|
Investor: | Ministry of Defence SR, prime contractor BAE Systems |
End user: | Ministry of Defence SR |
Supplier: | R&S |
Production: | VYVOJ Martin |
Start and duration: | 2014-2015; in operation |
Tactical Mobile Heliport TMPS
Slovak Air Forces (for abroad missions)
More detailsSlovak Air Forces (for abroad missions)
Tactical Mobile Heliport TMPS
TACAN
Slovak Air Forces
More detailsSlovak Air Forces
TACAN
Short description: | Installation of Tactical navigation system |
---|---|
Investor: | MoD SR; prime contractor: BAN2000 Berlin |
End user: | Slovak Air Forces |
Supplier: | 3S |
Production: | Fernau/BAN |
Installation: | 3S/BAN |
Start and duration: | 2003 – 2006; in operation |
Radio communication system for Air Forces of Slovak Republic
Slovak Air Forces
More detailsSlovak Air Forces
Radio communication system for Air Forces of Slovak Republic
Short description: | Nationwide Radio communication system for ATC and AD |
---|---|
Investor: | Ministry of Defence |
End user: | Slovak Air Forces |
Supplier: | 3S |
Production: | 3S |
Installation: | 3S |
Start and duration: | 2000 – 2010; upgraded 2021 |
ATC Poland
Polish Air Navigation Services
More detailsPolish Air Navigation Services
ATC Poland
ATC Bulgaria
Bulgarian Air Traffic Services Authority
More detailsBulgarian Air Traffic Services Authority
ATC Bulgaria
RMC AF Slovenia
Slovenia Air Forces
More detailsSlovenia Air Forces
RMC AF Slovenia
Short description: | Remote monitoring and control of radio comm. system |
---|---|
Investor: | Slovenia Air Forces |
End user: | Slovenia Air Forces |
Supplier: | STTM |
Production: | 3S |
Installation: | STTM |
Start and duration: | 2009; in operation; 2020 upgrade |
RMC North Macedonia
ATC Macedonia
More detailsATC Macedonia
RMC North Macedonia
Short description: | Remote monitoring and control of radio comm. system |
---|---|
Investor: | ATC Macedonia |
End user: | ATC Macedonia |
Supplier: | R&S |
Production: | 3S |
Installation: | 3S |
Start and duration: | 2003 – 2004; in operation; 2015 upgrade |